|
|
|
|
|
Method Statements Method Statements are essential for the control and eradication's of Japanese Knotweed being that every infested site has individual problems. The method statement informs all bodies which system of control and eradication and the specifications to the ground works contractors ad client and any other interested parties. Caledonia Environmental method statements are prepared in layman's terms so that the labourer to the Chief Executive can understand and operate the method statement. Reduce Dig© The reduce dig system is mainly used to reduce the volume of excavated Japanese Knotweed materials. Membranes The membrane system is mainly used to stop new infestations from site boundaries which have Japanese Knotweed growing on other parties land. It can also be used to protect completed excavations of Japanese Knotweed and also gives an extra assurance to all bodies involved in Japanese Knotweed control and eradication. Converting to Inert Materials© This is a major breakthrough regarding Japanese Knotweed contaminated excavations and can be done on site or of site depending on space. This system is environmentally friendly and will greatly reduce valuable space on all landfill sites in the UK and the World. Overseeing Overseeing Japanese Knotweed by a Caledonia Environmental appointed consultant is essential for the successful control and eradication of Japanese Knotweed. The overseeing procedure also gives the assurance to clients, local councils and the environmental agencies and anyone else that the correct procedures are done correctly. Please note all these systems are protected either by paten pending or by the copy right laws.© For further information regarding the above mentioned systems please contact Caledonia Environmental Ltd. |
|
Tel 01506-437967 Mobile 07889- 685536 E-mail japweed@aol.com |
|